The $170MM Integrated Project Delivery (IPD) project replaces over 67 Air Handling Units (5,000 to 25,000CFM) on an active medical campus. Additionally, new normal and emergency power distribution systems was installed to meet current National Electrical Code requirements. Project features include 12 Bell & Gossett 7500 MBH steam heat exchangers and associated pumps, 2 Normal Service Double Ended Square D 4.16 kV Substations, 2 Emergency Service Double Ended Square D 4.16 kV Substations, 22 ASCO ATS switches, ASCO Critical Power Management System, 92 distribution panels, 254 panel boards, and over 130 transformers.

Architect: EwingCole
Engineer: Bard, Rao + Athanas Consulting Engineers