Confidential Client – Bulk Sorbitol Facility

Fort Washington, Pennsylvania

The bulk sorbitol storage facility was constructed in an existing warehouse to meet cGMP requirements. Orbital-welded stainless steel piping system was installed for distribution of materials to process areas. The facility was built with clean-in-place, 20,000 gallon storage capacity.

SF: 10,000
Architect: The Sigel Group