Chester County Hospital Pharmacy

West Chester, Pennsylvania

The three-phase pharmacy renovation involved a fitout of shell space creating a storage and mixing area for all pharmaceutical and drugs. The area required cleans rooms, an IV prep room, chemo room, and anti-room. The team installed appropriate infrastructure for the exhaust hoods while the space required a negative room pressure for the dedicated HVAC. A prominent feature was the installation of the Talyst machine which houses every drug within this conveyor system.

SF: 2,200
Architect: Stantec
Cost: $1,400,000