Confidential Client – Mechanical & Electrical System N+1 Redundancy

West Chester, Pennsylvania

The N+1 redundancy of the mechanical and electrical systems were updated while not impacting the existing research facility. The project consisted of several complicated electrical, plumbing, and mechanical tie-ins all which were carefully scheduled with the building occupants in order to minimize disruption. Project features included two 34,000 CFM Trane AHUs and exhausts fans, two hot water boilers and pumps, two 38kV high voltage switches, new PLC-controlled electrical substation, two new 34kV to 208v transformers, and two diesel generators.

SF: 2,500 New, 1,000 Renovation
Architect: Arcus Design Group
Engineer: Precis Engineering & Genesis Engineering